MIL-DTL-14656B (ARMY)
preproduction sample, a first production sample, or a standard production item from the
contractor's current inventory. The first article should consist of one completed item. The
contracting officer should include specific instructions in acquisition documents regarding
arrangements for examination, approval of first article test results, and disposition of first
articles. Invitations for bids should provide that the Government reserves the right to waive
the requirement for samples for first article inspection to those bidders offering a product
which has been previously acquired or tested by the Government, and that bidders offering
such products, who wish to rely on such production or tests, must furnish evidence with the
bid that prior Government approval is presently appropriate for the pending contract.
6.4. Government loaned property. The contracting officer should arrange to loan the
property listed in 3.6.
6.4 Subject term (key word) listing.
Catch plate
Dap
Embossed
Forcer
Insignia
Loop
Sliding bar
6.5 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
Custodians:
Preparing activity:
Army - IH
Army - IH
Review activities:
(Project No. 8315-0424/001)
Army - GL
DLA - CT
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business